ATOS Stage 1

Description

Armed Group executed the full fit-out and technical setup for the seventh-floor extension of ATOS in Capital 4, City Stars. The journey began with precise measurements and layout design, followed by architectural modifications and the creation of secure spaces with gypsum and glass partitions.

Key works included structured cabling, full setup of the data center room (including fire-rated doors, raised flooring, fire alarm systems, air conditioning, racks, switches), and the integration of surveillance systems, access points, and digital access control.

Final steps involved fire-rated carpet installation, full painting, office furniture supply (desks, meeting tables, workstations), acoustic isolation booths, smart lighting replacement, and comprehensive branding installations including signage, logos, and banners.

Project Challenges

Key Requirements

Space design and architectural modifications

Full data center construction and setup

Structured cabling, fire system, HVAC

Furniture and acoustic solutions

Lighting revamp and branding implementation

Project Requirements

Deliver a modern, high-capacity office extension built to host tech operations and teams with secure, smart, and scalable infrastructure.