Armed Group executed the full fit-out and technical setup for the seventh-floor extension of ATOS in Capital 4, City Stars. The journey began with precise measurements and layout design, followed by architectural modifications and the creation of secure spaces with gypsum and glass partitions.
Key works included structured cabling, full setup of the data center room (including fire-rated doors, raised flooring, fire alarm systems, air conditioning, racks, switches), and the integration of surveillance systems, access points, and digital access control.
Final steps involved fire-rated carpet installation, full painting, office furniture supply (desks, meeting tables, workstations), acoustic isolation booths, smart lighting replacement, and comprehensive branding installations including signage, logos, and banners.
Project Challenges
- Ensuring secure IT infrastructure compliance within a tight timeline.
- Coordinating MEP, furniture, and tech installations without workflow overlap.
- Delivering high-end finishes while maintaining ATOS’s strict operational standards.



Key Requirements
Space design and architectural modifications
Full data center construction and setup
Structured cabling, fire system, HVAC
Furniture and acoustic solutions
Lighting revamp and branding implementation
Timeline
- Start Date: December 2023
- End Date: February 2024
Project Requirements
Deliver a modern, high-capacity office extension built to host tech operations and teams with secure, smart, and scalable infrastructure.